The McKnight’s Gate Guarding At Big Wells Texas

Wow what a day I forgot how much I hate moving. Yep we started changing to a new gate location at 6:30 this mornig and it has been none stopp until about 8 PM. I can’t remember whne I have been this tired. Starting out I thought that we would suely get wet, The clouds were real thick but they never let go of any water.

Big Wells Texas

We arrived at our new gate 3 miles west Of Big Wells off Highway 85 A well that has been drilled for some time and they are now setting up for Fracking. They brought in a couple of Frack tanks and a couple loads of pipes after we arrived. The Bossman stopped by about 5Pm and said that the crew and equipment would start arriving Sunday or Monday. Maybe we will have a couple of slow days so I can get finished setting up.

Beautiful Texas Sunset

We had a Beautiful sunset this evening so maybe tomorrow will bring a nice day.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>