The McKnight’s Gate Guarding At Big Wells Texas 3-10-2011

What a beautiful day we got up to this morning after a great nights sleep, Yes it had been several nights since we had both been able to sleep through the night without running to the gate every so often to let water or sand trucks in or out.

Here comes the workover rig

But stop NO NO it could not last for shortly after 10AM we thought that the circus had arrived but no it was the CC Forbes Work over Rig #14 here to start on the JS unit 1-H well.

Directional Drill Machine

Part of Rig 14

And the vehicles just kept coming through the gate.

Crew Quartes

Once the rig was in then came the living quarters for the crew but unlike the last house we had here these folks have 5th wheel and tag along trailer RV’S,

Potable Water Tank

The potable water tanks, Generators and lights. So it looks like we are back to 24 hour operations again.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>