Schwope Ranch Northeast of Cotulla Texas on Ranch Road 469

We started getting the equipment in today to get the other pads ready to deliver the top surface material.

Today had an exciting start as they had sevederal of the high up Company men in for a investors meeting and the 4 Chinamen arrived promply at 9 oclock. They was not long with there meeting and everyone departed the gate at approx 10:20.

After that the day was mostly normal with us recieving a Bulldozzer to get one of the pads ready for the installation of Cleiche and they came in and removed the mulcher that was clearing a new

They got finished witht he mulcher and a truck came in to pickit up

road for Pad-E.

They also delivered the Motor this evening that directs the pipe for the turn of the horizonal run.So I guess it won’t be long before they will be ready to start drilling the flat part.

Stay tuned and we will try to keep up here.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>