Monthly Archives: February 2012

Change back to the Mushroom stage on the Schwope Ranch

Yep  you guessed it we had another change yesterday at about 5:35PM the fellows that brought in the water pipes  for the frac of the wells came back to pick the pipes back up and informed us they they were told that … Continue reading

Posted in Uncategorized | 3 Comments

The end of the work-over Rig Down on the Schwope Ranch

Yep it all started at 3:32AM when the Flat beds came through the gate to pick up the drill pipes and shortly after that it became the normal stream of big rigs to take the rig off ranch. By noon … Continue reading

Posted in Uncategorized | Leave a comment

Down on the Schwope Ranch The Work-over Rig is working out.

These people are working beavers they arrived here early on Feb 12 and yesterday morning the big rigs was here to move them off of well one to well two. I guess that they needed new drill pipes as they … Continue reading

Posted in Uncategorized | 1 Comment

Down on the Schwope Ranch It is work,work again

Well the young fellow yesterday was for sure right when he stated that we should have a work-over rig arriving here this morning around 6:30AM. We logged the first truck into the gate at 6:47AM and it was pretty much non stop traffic until … Continue reading

Posted in Uncategorized | Tagged , | Leave a comment

Down on the Schwope Ranch looks like work again

Well now after three weeks of Idle looks like we might be getting back to the Business of some Down Texas Gate Guarding. Here at 9:30PM we got the first vehicle of the day at the gate with of all things a … Continue reading

Posted in Uncategorized | Tagged , , | Leave a comment