The end of the work-over Rig Down on the Schwope Ranch

Yep it all started at 3:32AM when the Flat beds came through the gate to pick up the drill pipes and shortly after that it became the normal stream of big rigs to take the rig off ranch. By noon it was all done with the exception of the internet people that came in late this afternoon to get there large Ant. About the only things left here now is a couple of lifts and a trash wagon.

The man was back in this afternoon to check out the water situation in the frac pond and stated that it looks like the crew should be in here in a few days to start that process. So maybe we will have a few days of rest before the rush starts. Other gates that we have been on for the past year get really busy when the frac is going. Spring seems to be popping out every where and the wild flowers are beautiful.

So as we move on along this Gate Guarding road. Stop back by to check on us and we will try to keep it interesting.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>